Yonge and Davisville

Residential

Yonge and Davisville

The Yonge and Davisville development is a proposed mixed-use development in Mid-town Toronto consisting of a two high-rise building connected by a multi-storey retail podium.

location

Yonge & Davisville, Toronto

Status

Coming Soon

Tentative Completion Date

TBD

Architect

Wallman Architects

Interiors

TBD

Landscape

TBD

Units

TBD

Type

High-Rise Residential

*The Completion Dates above are estimates only, subject to change from time to time by the Vendor without notice, and the Vendor makes no representations or warranties with respect to the completion of the project except as set out in a fully executed Agreement of Purchase and sale. No such estimate shall amend or modify the Statement of Critical Dates provided in any Agreement of Purchase and Sale which shall be deemed conclusive of any obligation relating to the completion timeline of the project. Please consult a sales representative for more details.

Careers

Want to Work With Us?

Life Construction is always on the look out for passionate individuals who enjoy working in challenging environments.

5800 Yonge Street

Residential

5800 Yonge Street

Located on the west side of Yonge Street between Drewry Avenue and Hendon Avenue in the Willowdale neighbourhood, 5800 Yonge Street is a project site that is well-serviced by public transportation and at present consists of a large 2-storey office building with surface parking formerly occupied by Toronto Hydro. Currently, the office building is used as a temporary Refugee Welcome Centre run by the City of Toronto.

location

5800 Yonge Street, Toronto

Status

Coming Soon

Tentative Completion Date

TBD

Architect

Wallman Architects

Interiors

TBD

Landscape

TBD

Units

TBD

Type

High-Rise Residential

*The Completion Dates above are estimates only, subject to change from time to time by the Vendor without notice, and the Vendor makes no representations or warranties with respect to the completion of the project except as set out in a fully executed Agreement of Purchase and sale. No such estimate shall amend or modify the Statement of Critical Dates provided in any Agreement of Purchase and Sale which shall be deemed conclusive of any obligation relating to the completion timeline of the project. Please consult a sales representative for more details.

Careers

Want to Work With Us?

Life Construction is always on the look out for passionate individuals who enjoy working in challenging environments.

Sixty Five Broadway

Residential

Sixty Five Broadway

Sixty Five Broadway is a luxurious pre-construction condominium development at the heart of midtown Toronto. With distinctive towers soaring above a four-storey podium, a private courtyard off Broadway is your tranquil oasis from the action of Yonge and Eglinton. The landscaping is soothing and minimal with manicured walkways and seasonal plantings. Beauty and serenity are by your side as you arrive home.

location

65 Broadway Avenue, Toronto

Status

Under Construction

Tentative Completion Date

2025 – 2026*

Architect

Wallman Architects

Interiors

Tomas Pearce

Landscape

Studio TLA

Units

389

Type

High-Rise Residential

Construction Update

As of May 1, 2024

The transformation at Sixty Five Broadway is well underway, and it’s a sight to behold. The once quiet street is now bustling with activity as shoring and excavation have been ongoing since November 2021. Two cranes now tower over the site, providing a glimpse of what’s to come. Site servicing has commenced and you won’t believe the progress that’s being made. The site is taking shape and it’s clear that something magnificent is being built! Follow us on Instagram and YouTube to stay up-to-date and learn more about these and other upcoming projects.

  • Zoning Bylaw (Complete)
    Formal Zoning By-law was issued on March 12, 2021.
  • Construction Management Plan (Complete)
    Our Construction Management Plan has been approved by City staff and Community Council approval on June 2021
  • Notice of Approval Conditions Status (Complete)
    Received its Notice of Approval Conditions (NOAC) on April 21, 2021.
  • Building Permit
    Received Demolition Permit on May 28, 2021 and Shoring & Excavation Permit on May 25, 2021. Received Foundation Permit on October 26, 2022.
  • Site Plan Approval (Complete)
    Received Site Plan Agreement on December 9, 2022.

Construction Status

  • Concrete Forming: Complete on all floors
  • Window Installation: Complete up to 30th floor
  • Building Envelope: Complete up to 25th floor
  • Mechanical Rough-in: Complete up to 8th floor
  • Electrical Rough-in: Complete up to 8th floor
  • Drywall: Complete up to 6th floor

*The completion dates above are estimates only, subject to change from time to time by the vendor without notice, and the vendor makes no representations or warranties with respect to the completion of the project except as set out in a fully executed Agreement of Purchase and Sale. No such estimate shall amend or modify the Statement of Critical Dates provided in any Agreement of Purchase and Sale which shall be deemed conclusive of any obligation relating to the completion timeline of the project. Please consult a sales representative for more details.

Careers

Want to Work With Us?

Life Construction is always on the look out for passionate individuals who enjoy working in challenging environments.

Richmond Park

Residential

Richmond Park

Coming soon in 2023 is Times Group’s low rise development located at 19th Avenue and Leslie Street in the North Leslie Richmond Park community. Over 600 homes and a mid rise building are nestled between parks, conservation areas, schools and a new community center.

location

19th Avenue & Leslie Street, Richmond Hill

Status

Coming Soon

Tentative Completion Date

2023 – 2024*

Architect

Icke Brochu Architects Inc.

Interiors

TBD

Landscape

TBD

Units

600+

Type

Residential

*The Completion Dates above are estimates only, subject to change from time to time by the Vendor without notice, and the Vendor makes no representations or warranties with respect to the completion of the project except as set out in a fully executed Agreement of Purchase and sale. No such estimate shall amend or modify the Statement of Critical Dates provided in any Agreement of Purchase and Sale which shall be deemed conclusive of any obligation relating to the completion timeline of the project. Please consult a sales representative for more details.

Pavilia Towers

Residential

Pavilia Towers

Standing proudly above the rest, the two remarkable buildings of Pavilia Towers reach up into the sky a full 41 and 38 storeys. That means our extraordinary views stretch out to the horizon, sunsets linger longer and the first rays of the morning sun touch Pavilia Towers while the rest of the city is still asleep. Tall, graceful, stately and elegant, this is the very pinnacle of living.

location

Hwy 7 & South Park Road, Thornhill

Status

Under Construction

Tentative Completion Date

Q4 2023*

Architect

Icke Brochu Architects Inc.

Interiors

N/A

Landscape

Schollen & Company Inc.

Units

769

Type

High-Rise Residential

Construction Update

As of February 2023

At Pavilia Towers, construction continues at a fast pace. Building A forming has been completed, tower crane removed, and window installations completed with the focus now turning to final in-suite installations, painting, and final finishes on upper level floors. Owners and tenants on lower floors have already begun moving in, with our designated leasing agent T2 Condo Rentals already leasing out 89 units to date. Suite electrical and mechanical rough-ins have reached the Lower Penthouse floor and interior and exterior walls have been completed. Building B forming has been completed as well as precast, except for the hoist units, with a focus now turning to in-suite electrical, mechanical and drywall installations. Occupancy of Building A commenced in the Fall of 2022, and is on-going. Follow us on Instagram and YouTube to stay up-to-date and learn more about these and other upcoming projects.

Building A

  • Forming completed and tower crane removed
  • Precast completed
  • Mechanical and electrical in slab rough ins completed
  • Suites mechanical and electrical rough ins completed
  • Interior and Exterior drywall completed
  • Window installation completed
  • Progress for hard landscaping stands at 90%
  • 89 units leased through T2 Condo Rentals

Building B

  • Forming completed and tower crane removed
  • Precast completed other than hoist units
  • Mechanical and electrical in slab rough ins completed
  • Suites mechanical and electrical rough ins at 18th floor
  • Interior drywall at 16th floor
  • Exterior drywall complete
  • Window Installation completed except hoist units

*The completion dates above are estimates only, subject to change from time to time by the vendor without notice, and the vendor makes no representations or warranties with respect to the completion of the project except as set out in a fully executed Agreement of Purchase and sale. No such estimate shall amend or modify the Statement of Critical Dates provided in any Agreement of Purchase and Sale which shall be deemed conclusive of any obligation relating to the completion timeline of the project. Please consult a sales representative for more details.

Careers

Want to Work With Us?

Life Construction is always on the look out for passionate individuals who enjoy working in challenging environments.

Riverview

Residential

Riverview

A landmark new address in Uptown Markham, Riverview is a stunning statement of success in one of Canada’s most desired communities. Here you will discover the consummate balance of historic village charm and modern energy. Live a short stroll from superb restaurants, unique shops, world-class products at Whole Foods and fine wines at the neighbouring LCBO. Explore green swaths of river lands from Unionville’s famed Toogood Pond to the Rouge River Valley right here in your own backyard. Smart. Sophisticated. Refined. Distinctive. Riverview.

location

Hwy 7 & Verdale Crossing, Markham

Status

Under Construction

Tentative Completion Date

Q4 2023*

Architect

Kirkor Architects + Planners

Interiors

Tomas Pearce Interior Design

Landscape

Schollen & Company Inc.

Units

1,042

Type

High-Rise Residential

Construction Update

As of February 2023

At Riverview, the construction journey is reaching new heights! Building C is fully-complete and is making waves with residents and tenants moving in. T2 Condo Rentals, our designated leasing agent for Riverview, has already leased an impressive 156 units, proving that Riverview is the place to be. Meanwhile, Building A is coming to life with its stunning exterior façade reaching its final stages and architectural accents adding the finishing touches. The concrete forming, windows, and building envelope are complete and all focus is now on the final touches – from mechanical, electrical, drywall, flooring, and cabinet installations. Building B is hot on its heels, with concrete forming, windows and building envelope complete, and all eyes are on the final installations. With ongoing occupancies all the way until Q4 2023, Riverview is poised to make a big impact on the community. Follow us on Instagram and YouTube to stay up-to-date and learn more about these and other upcoming projects.

Building A

  • Concrete forming completed on all floors
  • Window installation completed on all floors
  • Building envelope completed on all floors
  • Mechanical rough-in completed up to 35th floor
  • Electrical rough-in completed up to 35th floor
  • Drywall up complete up to 30th floor
  • Tile installation completed up to 23rd floor
  • Flooring installation completed up to 21st floor
  • Trim carpentry completed up to 24th floor
  • Cabinetry completed up to 20th floor
  • Green roof of the Podium remains to be completed

Building B

  • Concrete forming completed on all floors
  • Window installation completed on all floors
  • Building envelope completed on all floors
  • Mechanical rough-in completed up to 20th floor
  • Electrical rough-in completed up to 20th floor
  • Drywall completed up to 18th floor
  • Tile completed up to11th floor
  • Flooring completed up to 4th floor
  • Trim carpentry completed up to 14th floor
  • Cabinetry completed up to 4th floor
  • Green roof of the Podium remains to be completed

Building C

  • Construction Complete
  • PDI and Occupancy Complete
  • 156 Units Leased Through T2 Condo Rentals

Landscaping

  • Progress for hard landscaping stands at 90%

*The completion dates above are estimates only, subject to change from time to time by the vendor without notice, and the vendor makes no representations or warranties with respect to the completion of the project except as set out in a fully executed Agreement of Purchase and Sale. No such estimate shall amend or modify the Statement of Critical Dates provided in any Agreement of Purchase and Sale which shall be deemed conclusive of any obligation relating to the completion timeline of the project. Please consult a sales representative for more details.

Careers

Want to Work With Us?

Life Construction is always on the look out for passionate individuals who enjoy working in challenging environments.

Pavilia Park

Residential

Pavilia Park

This is the perfect place to realize the privileged lifestyle you deserve. You’ll come home to a prestigious address, just off Bayview Ave. You’ll take quiet pride in your stunning open concept contemporary townhome. You will know the reassurance of trusting Times Group, the builder who has virtually drawn the skyline of lower Richmond Hill and Markham along Hwy 7. Picture the sun rising over your neighbourhood park. The amenities at your doorstep. The joy of living in a beautiful home where everywhere you look, your eye lingers in appreciation. You always knew that if you held the vision, you would own it. And now, Pavilia Park is here.

location

Hwy 7 & South Park Road, Thornhill

Status

Completed

Completion Date

2020

Architect

Icke Brochu Architects Inc.

Interiors

N/A

Landscape

Schollen & Company Inc.

Units

134

Type

Low-Rise Residential

Careers

Want to Work With Us?

Life Construction is always on the look out for passionate individuals who enjoy working in challenging environments.

Valleymede Towers

Residential

Valleymede Towers

Created with an urban chic hotel feel, Valleymede Towers stands out with its striking modern architecture and skillfully layered textures. Layouts offers the maximum in style and comfort, each with expansive outdoor balconies and terraces. Exclusive to Valleymede Towers is its incredible selection of luxuriously appointed amenities, including a state-of-the-art fitness studio, a vibrant multi-purpose/party room, a library, and a billiards lounge. Other features include modern, boutique style lobbies, beautiful guest suite and an expansive multi-purpose rooms.

location

396 Hwy 7 East, Richmond Hill

Status

Completed

Completion Date

2020

Architect

Kirkor Architects + Planners

Interiors

Tomas Pearce

Landscape

Schollen & Company Inc.

Units

308

Type

High-Rise Residential

Careers

Want to Work With Us?

Life Construction is always on the look out for passionate individuals who enjoy working in challenging environments.

Luxe Towns

Residential

Luxe Towns

Luxe Towns are an exclusive limited collection of forty-five, 3-storey, 2-car or 3-car garage townhomes, situated in the highly sought after Southern Richmond Hill area. Residents will be surrounded by an incredible array of shopping, world-class golf courses, and lush parks. They will also get to choose from an array of highly acclaimed schools from much noted daycares to the much anticipated and talked about future York University. Times Group has developed almost 25 acres of luxurious parkland, just steps away.

location

Hwy 7 & Valleymede Drive, Richmond Hill

Status

Completed

Completion Date

2020

Architect

Kirkor Architects + Planners

Interiors

Tomas Pearce

Landscape

Schollen & Company Inc.

Units

88

Type

Low-Rise Residential

Careers

Want to Work With Us?

Life Construction is always on the look out for passionate individuals who enjoy working in challenging environments.

Village Park II

Residential

Village Park II

This master-planned community is located on the north side of Highway 7. Imagine living off Village Parkway and directly across from Uptown Market and less than a kilometer from the shops and restaurants of Main Street Unionville.

location

Village Parkway & Hwy 7, Unionville

Status

Completed

Completion Date

2018

Architect

Kirkor Architects + Planners

Interiors

Renato Iamonaco

Landscape

Schollen & Company Inc.

Units

110

Type

Low-Rise Residential

Careers

Want to Work With Us?

Life Construction is always on the look out for passionate individuals who enjoy working in challenging environments.